Marine Mitra

What is the correct pond drying and liming protocol for shrimp farming?

Biosecurity · Updated · Marine Mitra — Biosecurity Consultant

త్వరిత సమాధానం · Quick answer

CIBA-verified shrimp pond drying and liming protocol: 1) Drain pond completely and dry 15-20 days. 2) Plough bottom 15-20 cm deep to release poisonous gases. 3) Remove sludge accumulated from previous crop centrally. 4) For acid sulphate soil — do NOT complete dry, apply zeolite or aluminium silicate at 250 kg/ha to prevent contact between water and acid soil. 5) Apply lime based on soil pH and available nutrient testing. Inlet mesh sizes vary by DOC: 600 µm before 15 DOC, 1200 µm 15-45 DOC, 1800 µm after 45 DOC.

మీ చెరువు పుస్తకం ఫోన్‌లో · Keep your pond's book on your phone Pond Book · Google Play

Source — verified CIBA Package of Aquaculture Practices 2021

The pond preparation, drying and liming protocol below is directly from the ICAR-CIBA Package of Aquaculture Practices 2021, section on shrimp pond preparation.

The standard drying protocol

Directly verified from CIBA Package 2021:

"Draining the pond and exposing to sunlight increase the productivity and help in eliminating unwanted organism. Ploughing the pond bottom to a depth of 15-20 cm helps the release of poisonous gases. The sludge accumulated at the centre of the pond during the previous farming period should be removed."

Step-by-step:

1. Complete drainage. Remove all water from the pond using sluice gates and pumps. No residual water pools.

2. Sun exposure (15-20 days). Direct sunlight kills pathogens (WSSV, EHP spores, Vibrio) and oxidises organic matter. Tropical sun temperature at pond bottom can exceed 50°C — lethal to most aquaculture pathogens after sustained exposure.

3. Ploughing 15-20 cm deep. The plough turns over the bottom soil layer, exposing buried pathogens and reduced compounds (H2S, methane) to oxygen for oxidation.

4. Sludge removal. Central sludge accumulated from previous crop must be physically removed. This sludge contains:

Critical exception — acid sulphate soil

Directly from CIBA Package 2021:

"In the case of pond having acid sulphate soil, complete drying of pond bottom is not recommended. Zeolite or aluminium silicate at 250 kg/ha is applied to prevent the contact of water with the acid sulphate soil by forming a sediment layer in between."

Acid sulphate soil identification:

Treatment for acid sulphate soil:

Soil quality verification (before pond use)

From the same CIBA source — ideal soil quality parameters:

Bird and predator exclusion

From CIBA Package 2021:

"As a part of ensuring bio-security measures and to prevent the entry of birds and animals, the top of the pond is covered by net of 100 mm mesh size and the side is fenced with stiff net of 26 mm mesh size or shade net up to a height of minimum 1.8 m."

Specifications:

Birds (egrets, kingfishers, cormorants) are documented WSSV vectors — they carry viable virus particles between ponds.

Inlet mesh sizes (verified from CIBA Package 2021)

Mesh size of nylon screens at inlet sluice gate varies by culture stage:

Days of CultureMesh size
Below 15 DOC600 micron
15-45 DOC1,200 micron
Above 45 DOC1,800 micron

Why mesh size varies:

Setup: Wire mesh on outer side + nylon screen on inner side of sluice gate (double protection).

Water filling and fertilisation

After drying, liming, and sludge removal:

Fill water through reservoir (not direct from canal — aged 7-10 days in reservoir first).

Fertilisation (from Aquaculture Authority Guidelines):

Applied based on soil nutrient testing.

For Nitrogen (urea):

For Phosphorus (super phosphate):

Wait period before stocking

Allow 7-10 days after fertilisation for:

Stocking PL into pond without proper bloom development causes early-DOC mortality from poor water quality and inadequate natural food.

Summary protocol

  1. Drain completely
  2. Dry 15-20 days (or apply zeolite 250 kg/ha for acid sulphate soil)
  3. Plough 15-20 cm deep
  4. Remove central sludge
  5. Install bird net (100 mm top), side fence (26 mm or shade net, 1.8 m)
  6. Install inlet mesh appropriate to DOC stage
  7. Fill through reservoir (7-10 days aged)
  8. Fertilise based on soil testing
  9. Wait 7-10 days for bloom
  10. Stock PCR-tested SPF PL

Related Guides

ఇవి కూడా చదవండి · Related questions

జీవ భద్రత · All Biosecurity questions →