How to prepare a vannamei pond before stocking — step by step
త్వరిత సమాధానం · Quick answer
Vannamei pond preparation: 1) Drain pond completely and dry 15-20 days. 2) Plough bottom 15-20 cm deep to release toxic gases. 3) Remove accumulated sludge from previous crop. 4) For acid sulphate soil: apply zeolite at 250 kg/ha (do not complete dry). 5) Strengthen dykes, repair sluice gates. 6) Install wire mesh outer + nylon screen inner filters at inlet (mesh 600 µm <15 DOC, 1200 µm 15-45 DOC, 1800 µm >45 DOC). 7) Bird netting top, side fencing. 8) Fill water through reservoir, fertilise for bloom.
మీ చెరువు పుస్తకం ఫోన్లో · Keep your pond's book on your phone Pond Book · Google Play
Source
This pond preparation protocol is verified from the ICAR-CIBA Package of Aquaculture Practices (2021) and Aquaculture Authority Guidelines — official Indian sources.
Step-by-step pond preparation
Step 1: Soil quality verification
From CIBA guidelines:
- Ideal soil: pH 6.5-8, organic carbon 1.5-2.5%, electrical conductivity >4
- Clayey loam preferred
- Acid sulphate soil is NOT advisable
- Test soil from 1 m depth
Step 2: Pond size and shape
- Water spread area: 0.5-2 ha
- Length to width ratio: 2:1
- Depth: 1-1.5 m
- Site elevation: 0.2-0.5 m above high tide level (for easy preparation and harvesting)
Step 3: Dykes and water structures
- Peripheral dyke: 60 cm above maximum flood level, 3 m top width
- Internal bund: 30 cm freeboard, 1 m top width
- Inlet and outlet: diagonal, 150 cm wide sluice gates per hectare
- Excavated earth used for dyke construction
Step 4: Drying and ploughing
- Drain pond completely and expose to sunlight
- Plough bottom 15-20 cm deep — this helps release poisonous gases (H2S, methane) from previous crop sludge
- Drying period: 15-20 days
- Critical exception: For acid sulphate soil, complete drying is NOT recommended. Apply zeolite (aluminium silicate) at 250 kg/ha to form a sediment layer preventing water-acid soil contact
Step 5: Sludge removal
Accumulated sludge at pond centre from previous farming period MUST be removed before next crop.
Step 6: Repair and service
- Strengthen dykes — plug all holes and crevices
- Repair sluice gates
- Service farm machinery (aerators, pumps, generators)
Step 7: Inlet filter mesh (legally required for biosecurity)
Mesh size varies by culture stage:
- Less than 15 DOC: 600 µm
- 15-45 DOC: 1,200 µm
- More than 45 DOC: 1,800 µm
Use wire mesh on outer side + nylon screen on inner side of sluice gate.
Step 8: Bird and predator exclusion
- Top of pond: net with 100 mm mesh size (covers entire pond)
- Side fencing: stiff net with 26 mm mesh or shade net up to minimum 1.8 m height
This is for biosecurity — prevents bird-borne pathogen entry and crab/predator intrusion.
Step 9: Water filling
- Fill via reservoir pond (do not use canal water directly)
- Aged 7-10 days in reservoir before transfer
- Filtered through the inlet mesh
Step 10: Fertilisation and bloom development
From Aquaculture Authority guidelines:
- Apply TSP based on available P in soil (100 kg/ha if available P below 1.5 mg/100g soil)
- Apply urea based on available N (100 kg/ha if N below 12.5 mg/100g)
- Wait 7-10 days for diatom bloom (Secchi 30-45 cm)
What this preparation prevents
- EHP spores from previous crop (broken by drying + lime)
- WSSV residue in sludge (removed)
- Wild carrier entry (inlet mesh)
- Bird-borne WSSV (bird netting)
- Acid sulphate stress (zeolite barrier)
- Wide pH swings (alkalinity buffering)
Skipping any step compromises the entire crop's disease management foundation.