How to manage a shrimp pond between two crop cycles
త్వరిత సమాధానం · Quick answer
Inter-crop pond management: drain completely within 3 days of harvest, remove sludge within 5 days, begin bottom drying (target 15-20 days minimum), apply quicklime at 6,000 kg/ha after 10 days of drying, refill from reservoir and establish bloom (7-10 days), then stock. Total minimum inter-crop time: 30-35 days. Compressing below 20 days accumulates EHP and Vibrio into the next crop.
మీ చెరువు పుస్తకం ఫోన్లో · Keep your pond's book on your phone Pond Book · Google Play
The inter-crop period determines next crop success
Most farmers think about the crop. The best farmers think about the gap between crops. The 30-35 days between harvest and next stocking decide whether the pond enters the next crop with clean bottom conditions or carries accumulated EHP spores, Vibrio biofilms, and organic load into a fresh batch of expensive SPF PL.
The 7-step inter-crop sequence
Step 1: Complete drain (day 0-3 after harvest). Fully drain the pond. Remove the central drain cap or open all sluice gates. The pond floor must be completely exposed to air and sunlight to begin the drying process. Partially drained ponds with residual water slow drying and allow pathogen survival in the wet sediment.
Step 2: Sludge removal (day 1-5). While pond bottom is still wet and workable, excavate accumulated sludge from the centre and low points. This organic matter is the concentrated reservoir of EHP spores, Vibrio, and H2S-generating bacteria. Remove and dispose outside the farm perimeter — do not pile on the pond bund where rainfall can wash it back.
For ponds with heavy sludge (above 10 cm depth), mechanical excavation (small JCB or manual labour with wheelbarrows) is necessary. Light sludge (3-5 cm) can be raked to edges and removed.
Step 3: Dry-out (day 5-25). Minimum 15 days, 20 days preferred, of complete bottom drying. Sunlight and desiccation kill EHP spores (they lose viability after 15+ days without moisture), most surface Vibrio, and collapse the anaerobic bacterial community responsible for H2S.
Indicator of sufficient drying: bottom surface cracks, shows dry soil to at least 3-5 cm depth, and no moist spots in the centre.
Step 4: Quicklime application (around day 15 of drying). Apply quicklime (CaO) at 6,000 kg/ha evenly across the dry bottom. Water the lime lightly to initiate the exothermic reaction — CaO + H2O → Ca(OH)2 + heat. The heat generated (above 70°C in the lime layer) kills most surviving pathogens and raises soil pH to 12+, which is lethal to most organisms.
Alternative: agricultural lime (CaCO3) at 2,000 kg/ha if quicklime is unavailable — less potent but still effective for routine between-crop preparation in ponds without disease history.
Step 5: Reservoir fill and aging (day 25-32). Fill the pond from a reservoir that has aged for minimum 7 days. Check salinity, pH, DO, and alkalinity on the fill water before pumping.
Step 6: Fertilisation and bloom establishment (day 32-40). Apply TSP at 5-8 kg/ha and urea at 10-15 kg/ha in split doses over 3-5 days to initiate bloom. Wait until Secchi disc reads 30-40 cm (stable bloom) before stocking.
Step 7: Stock (day 35-42). With stable bloom, stable pH (7.8-8.3), DO above 5 ppm in the morning, and PCR-tested PL in hand — stock.