Biosecurity checklist for vannamei shrimp farms in India
త్వరిత సమాధానం · Quick answer
Vannamei biosecurity checklist: pre-stocking (PCR-tested SPF PL, quicklime 6000 kg/ha, dry bottom 15-20 days, reservoir functioning, screens intact), stocking day (acclimatise 30-60 min, stock at cool hour), daily (footbath fresh, dead shrimp removed within 2 hours, DO checked at dawn), weekly (sampling and recording, equipment disinfection, screen inspection), post-harvest (full pond dry-out, sludge removal).
మీ చెరువు పుస్తకం ఫోన్లో · Keep your pond's book on your phone Pond Book · Google Play
Pre-stocking checklist (7-14 days before stocking)
☐ Pond bottom fully dry — minimum 15 days, 20 preferred
☐ Quicklime (CaO) applied at 6,000 kg/ha or agricultural lime (CaCO3) at 2,000 kg/ha after drying
☐ Sludge removed or reduced to less than 5 cm depth in culture area
☐ Intake screens intact — 300-500 micron mesh, no gaps or tears
☐ Reservoir filled and aged — minimum 7 days before pond fill
☐ Pond filled from reservoir (not directly from canal) to target depth
☐ Bloom established — Secchi disc 30-45 cm before stocking
☐ pH stable at 7.8-8.3 for 24 hours before stocking
☐ PCR certificates received from hatchery — WSSV, EHP, AHPND negative for the specific batch
☐ Footbath installed at farm entry with 200 ppm chlorine solution
Stocking day checklist
☐ Stock at cool hours — early morning 5-7 am preferred
☐ Acclimatise bags on pond surface for 20-30 minutes
☐ Add pond water to bags gradually over 30-60 minutes (salinity acclimatisation)
☐ Release on upwind side of pond
☐ Record exact count, time, source, and conditions in stocking log
Daily operational checklist
☐ Footbath solution refreshed (every 4-6 hours during high-traffic periods)
☐ Dead shrimp identified and removed from pond within 2 hours of observation
☐ Pre-dawn DO checked (4-5 am) — confirm above 4 ppm
☐ Feed consumption checked via trays — record response percentage
☐ Bund walk at sunrise — note any surface swimmers or abnormal behaviour
☐ Visitor log completed for any visitors
Weekly checklist
☐ Cast-net sample — 30 shrimp, ABW, clinical signs, weight range documented
☐ Water quality test — DO, pH, salinity, alkalinity, ammonia
☐ Cast net and sampling equipment disinfected (200 ppm chlorine, 30-minute soak)
☐ Intake screens inspected and cleaned
☐ Reservoir level and condition checked
☐ Feed log updated with weekly FCR calculation
Post-harvest / inter-crop checklist
☐ All shrimp harvested or mortalities removed — empty pond
☐ Water drained through settling treatment pond (chlorinate at 30 ppm, hold 7 days before release)
☐ Sludge excavated and disposed outside farm perimeter
☐ Bottom dried — begin dry-out day count from complete drainage date
☐ Equipment cleaned and stored — cast nets dried, trays cleaned, pumps flushed
☐ Crop records consolidated and stored